Date: 2026-08-28 16:18
Summary: Dropped the CIDR theme hub; mapped long-tail intents to eleven /tools/{slug} candidates, each with a distinct H1 and at least three Information Gain items.
[question] 1、还是按照原来的路由设置url。不再做主题页。2、按照意图重新尽量拆分长尾关键词为slug和title,但是需要增加足够的info gain
[try to solve]
Keep existing tool URLs: /{lang}/tools/{slug} only. No /cidr hub.
Split only where the job, algorithm, or failure modes differ enough to fill IG without doorway clones. Proposed slugs and English H1s: cidr-to-host-range (IPv4 CIDR to host range), subnet-mask-to-cidr, cidr-prefix-chart, ip-range-to-cidr, cidr-to-ip-list, ipv6-cidr-calculator, vlsm-subnet-calculator, cidr-overlap-checker, terraform-cidrsubnet, vpc-cidr-planner, private-cidr-checker. Head terms cidr calculator / cidr notation stay secondary copy, not sole H1s. Inverse range conversion, Terraform helper functions, AWS vs Azure, and per-prefix pages stay merged. Weekly build still prefers long-gap slugs (terraform, list summarization, overlap, IPv6, IP list, private checker, VPC planner). No work-tasks opened.
[actions]
- Appended revision section to
docs/seo/serp-batches/2026-08-28-cidr-keyword-planner.md - Updated CIDR rows in
docs/seo/keyword-daily-pool.tsv(paths/tools/{slug}) - Appended decision in
docs/seo/keyword-to-tool-tracker.md