Date: 2026-08-24 22:22 Summary: Consolidated follow-up plans from SEO tracker, GSC todo, tool inventory, and keyword funnel.
[question] 查看后续计划
[try to solve]
1. SEO operations (P0, near term)
Sources: docs/seo/reviews/2026-08-12/03-todo.md, 02-next-strategy.md
Indexing & hygiene (open)
- Re-export GSC 28-day performance report (target window 2026-08-26–09-09)
- Add
Disallow: /api/torobots.txt - Confirm
/devlogs/*isnoindexin production - Unify trailing-slash canonical + 301 for info pages (fr/ja/pt/zh privacy/terms/contact)
- Expand GSC issues: soft 404 ×1, 4xx ×1, canonical conflict ×1 — list concrete URLs and fix
- Confirm last deploy:
build:site, sitemap submit, IndexNow incremental - Optional:
npm run verify:r2:live(after a successful CF deploy)
CTR / meta (done 2026-08-20; watch)
- ru image-merge, en schema-jsonld-generator, es how-to-calculate-volume, en how-to-calculate-npv: title/description updated and IndexNow’d
- Next round: compare CTR, clicks, es sqft, ru image-merge with ≥28 days of data
Observation window (P1, 2–4 weeks)
- ja marginal-revenue and es/pt ROI: wait for longer-window impressions before concluding
- Multilingual image-cluster pages not indexed → open IG per slug; do not sweep 110 URLs
- de IP still ranked >70 → enrich German FAQ/Example copy
- Image-related Russian/Arabic queries → absorb into existing tools; no new doorway pages
2. Keyword funnel (ongoing cadence)
Sources: docs/seo/keyword-to-tool-tracker.md, 2026-08-20-long-tail-gap-strategy.md
Strategy: avoid head-term wars; focus on long_gap / locale_gap; ship ≤1–2 new tools per week; prefer absorb.
Todos
- Weekly review: update each
keyword-daily-pool.tsvrow’sverdict+competition_tier - Roots → AdWords: 3–5 slugs/week; seed Keyword Planner from tool-keyword-roots; pool long-tails and absorb
- Schedule
absorbrows to update existing titles/FAQs - Milestone M2: ≥2 consecutive weeks of draw/review that can be retrospected
- Milestone M7: first Keyword Planner pass with ≥3 slugs of long-tails pooled and absorbed
Build candidates (pool only; no work-tasks yet)
safe-paste-cleanermagnet-pull-force-calculator
Freshness pipeline (weekly scan)
- New GSC queries → prefer absorb
- Rising long-tails from Trends + Planner
- Social/HN/product-launch verb groups → keep only browser-doable tool intents
3. Tool development backlog
Source: docs/2026-08-08-tool-inventory-table.md (123 live / 13 P0 not started)
P0 not started (quick list)
create-zip-fileunzip-file(slug already in catalog; inventory table may lag)safe-paste-cleanerai-token-counterchat-export-converterios-app-screenshot-resizerapp-icon-generator-packamazon-image-resizerfavicon-and-pwa-icon-packsocial-share-image-pack
work-tasks status ready and already in catalog (SEO tool cluster) (briefs locked; engineering/i18n can proceed as capacity allows): csv-json, pdf-watermark, open-graph-preview, on-page-seo-checker, pdf-page-to-image-sizes, robots-txt-generator, utm-builder, hreflang-generator, unlock-pdf, pdf-to-markdown, archive-extractor, schema-jsonld-generator, sitemap-xml-generator, meta-serp-preview, meta-tag-generator.
Pending POC: local-bg-removal, ocr-to-text, audio-wav-mp3
4. Recent strategy directions
- Bing AI Summary (2026-08-21): do not chase GIMP-style desktop-tutorial intent; attack “online/browser crop” queries this site can answer; clear structure + IndexNow; do not use “appear in summary” as a KPI
- New phrase discovery (2026-08-21): multi-source signals → dedupe → interactive task + SERP gap → enter funnel; never create a page for every new phrase
5. Suggested priority (this week)
- Finish SEO P0: robots / trailing slash / devlogs noindex / GSC anomaly URLs
- Prepare 28-day GSC export (late August–early September)
- Keyword weekly review + 3–5 slug AdWords long-tails
- Tools: pick one from P0 not-started (e.g. create-zip-file / safe-paste-cleaner) or advance the ready-cluster i18n, by capacity
[actions]
- Consolidated from
docs/seo/,work-tasks/, tool inventory, and recent dev-logs (no product code changes)