Date: 2026-08-09 08:26 Summary: Continued Omni §12 remaining tools through #19 tile; catalog at 71 with full coverage gates each slug.
[question] 继续完成剩下工具
[try to solve] Shipped §12 #14–#19 serially without skipping coverage/localization: ideal-weight, CAGR, NPV (~1307.29), standard-deviation (population SD=2 on classic set), concrete (2.0 m³), tile (147 pieces). Each used work-tasks briefs, coverage:gate 0b→2→4→all, independent ten-locale rewrites, build:site, lint:seo. Next: #20 aspect-ratio onward through #62.
[actions]
- Multiple work-tasks/pages/i18n/catalog/inventory/README updates for slugs #14–#19